QA Mirror
QA Mirror
Automation Practice Lab

Sortable Lists Automation Scenarios

A test suite for sortable lists and grids. Automation requires performing precise drag-and-drop actions to reorder elements and verify their new positions.

1. Simple Sortable List

Vertical Reordering
  • Item 1: Highest Priority
  • Item 2: Medium Priority
  • Item 3: Low Priority
  • Item 4: Lowest Priority

2. Connected Lists

Inter-Container Transfer

To Do

  • Task A (Drag to Done)
  • Task B (Reorder)

Done

  • Task C (Completed)

3. Grid Sorting & Handle Constraint

Horizontal & Handle Logic

Sortable Grid (Horizontal)

  • Grid 1
  • Grid 2
  • Grid 3
  • Grid 4
  • List with Drag Handle

    Item only drags if handle is used.

    • Item A
    • Item B
    • Item C